Difference between revisions of "Process"

From FNNC
Jump to: navigation, search
(Process Areas)
(Buildings)
Line 19: Line 19:
 
*[[BU-1103]]
 
*[[BU-1103]]
 
*[[BU-1104]]
 
*[[BU-1104]]
 +
*[[BU-1701]]
 +
*[[BU-1702]]
 +
*[[BU-1601]]

Revision as of 21:53, 19 June 2018

The Process area refers to all chemical processes in refining the natural gas and disposing of produced waste. Process is sorted two different ways; by process area and geographically by building.

Process Areas

  1. Intro
  2. Inlet Separation and Filtering
  3. MDEA Sweetening
  4. TEG Dehydration
  5. Lean Amine Feed
  6. Amine Regeneration
  7. Regen Overhead System
  8. Solution Conditioning
  9. Outlet and Compression
  10. Flares and Incinerators

Buildings